Torrens Rail Junction Project
- Status
- Completed March 2018
- Location
- Adelaide, SA
Project Description
The Department of Planning, Transport and Infrastructure engaged High Impact Solutions to undertake Hydro Demolition of key areas under the bridge piles and pile walls down at the Torrens Rail Junction located in the Park Lands between Port Road, Thebarton and War Memorial Drive, North Adelaide.
Reason for Engagement
Concrete strengthening to the Bridge Piles and Pile Walls was required.
Scope of Work
Supply and demolition of concrete areas needing strengthening and/or repair.
Services
- Civil Construction
- Robotic Hydro Demolition
- Robotic Demolition
- Hydro Demolition Lance
- UHP Water Blasting
- Structural Strengthening
- Reinforcement Replacement
- Robotic Rock and Concrete Drilling
Key Outcomes
- Selective removal of weak concrete
- Pile repair
- Concrete repair - removal of selected concrete surfaces to a preset quality depth, leaving a jagged or craggy surface that provided an extensive bonding area for the new concrete